Skip to product information
1 of 6

Vesgantti

Vesgantti Full Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam,Support & Pressure Relief,Medium Firm Feel for Aults(Full Size)

Vesgantti Full Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam,Support & Pressure Relief,Medium Firm Feel for Aults(Full Size)

Regular price $254.99 USD
Regular price $254.99 USD Sale price
Shipping calculated at checkout.

Overview

  • Brand : Vesgantti
  • Size : Full
  • Product Dimensions : 75"L x 54"W x 12"Th
  • Top Style : Tight Top
  • Cover Material : Cotton Blend
  • Number of Layers : 3
  • Fill Material : Spring and Foam
  • Special Feature : Breathable, Hypoallergenic, Low Motion Transfer, Orthopedic, Pressure Relief
  • Color : Blue and White
  • Coil Type : Pocketed Coil
  • Item Weight 67 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 67 Pounds
  • : Item Firmness Description Medium Firm

About this item

  • Support and Comfort: The full size mattress features individually wrapped pocket coils and pressure-relieving foam, which work together to provide targeted support, cradle your body shape and ease the aches and pains, so you awake feeling refreshed. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Cooling and Breathable: The cooling gel particles and air-flow between coils make the foam ventilated, expel steamy sweat, maintain a comfortable sleep environment all night
  • Isolated Motion: The individually pocket spring allow it to absorb movement from your partner, you sleep deeply and soundly never be disturbed all night
  • Healthy and Skin-Friendly: Made of foam approved by CertiPUR-US, non fiberglass, non toxic, hypoallergenic, Vesgantti mattress is an affordable and optimal option for your family
  • Full Mattress in a Box: Vacuum Packed in a box, smaller size, easy to carry. We recommend allowing 72 hours for the mattress to be fully expanded. If you have any issues, please let us know without hesitation
View full details
  • ⭐⭐⭐⭐⭐

    "The mix of modern design and natural colors makes these chairs versatile for any room in my house."

    Michael B.

  • ⭐⭐⭐⭐⭐

    "Elegant, comfortable, and built to last. The brown leather dining chairs transformed our dinner space completely."

    Sophia L.

  • ⭐⭐⭐⭐⭐

    "Every detail is thoughtfully designed. The stitching, the wood finish, everything speaks of elegance."

    Ethan S.