Skip to product information
1 of 6

Vesgantti

Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available, Ergonomic Design with Memory Foam and Pocket Spring, Medium Firm Feel, Grey

Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available, Ergonomic Design with Memory Foam and Pocket Spring, Medium Firm Feel, Grey

Regular price $269.99 USD
Regular price $269.99 USD Sale price
Shipping calculated at checkout.

Overview

  • Brand : Vesgantti
  • Size : Twin
  • Product Dimensions : 75"L x 39"W x 10"Th
  • Top Style : Euro Top
  • Cover Material : Breathable Knit Fabric Blend
  • Number of Layers : 4
  • Fill Material : Memory Foam
  • Special Feature : Breathable
  • Color : Grey
  • Coil Type : Pocketed Coil
  • Item Weight 47 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 47 Pounds
  • : Item Firmness Description Medium Firm

About this item

  • 【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers
  • 【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night
  • 【Breathable Mattress】Vesgantti twin mattress designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment
  • 【Sleep Well】Vesgantti Hybrid Mattress offers a medium firm plush feel, Satisfies most people's sleep preferences, You can enjoy a comfortable sleep every night with the purchase of our mattresses
  • 【Mattress In a Box】The mattress arrives compressed and rolled in a box for easy delivery and setup. Simply unbox, unroll, and let it expand to its full size within a few hours, but please allow 24-72 hours for it to fully expand
View full details
  • ⭐⭐⭐⭐⭐

    "The mix of modern design and natural colors makes these chairs versatile for any room in my house."

    Michael B.

  • ⭐⭐⭐⭐⭐

    "Elegant, comfortable, and built to last. The brown leather dining chairs transformed our dinner space completely."

    Sophia L.

  • ⭐⭐⭐⭐⭐

    "Every detail is thoughtfully designed. The stitching, the wood finish, everything speaks of elegance."

    Ethan S.