Vesgantti
Vesgantti Full Size Mattress, 10 Inch Hybrid Full Mattress in a Box, Pillow Top Double Bed Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Plush Feel
Vesgantti Full Size Mattress, 10 Inch Hybrid Full Mattress in a Box, Pillow Top Double Bed Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Plush Feel
Couldn't load pickup availability
Overview
- Brand : Vesgantti
- Size : Full
- Product Dimensions : 75"L x 54"W x 10"Th
- Top Style : Pillow Top
- Cover Material : Polyester
- Number of Layers : 8
- Fill Material : Foam
- Special Feature : pillow top
- Color : White
- Coil Type : Pocketed Coil
- Item Weight 62 Pounds : Item Firmness Description Medium
- : Item Weight 62 Pounds
- : Item Firmness Description Medium
About this item
- 【Medium-Firm Plush Feel】- Fully expanded 75*53*10 inch(LWH) approx. Vesgantti luxury mutilayer foam and pocket spring support systerm provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains
- 【Individual Pocket Spring】- Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- 【Breathable and Healthy】- Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- 【Ultra Quite】- Due to the pocket spring + multilayer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Make sure no one is stanting at the direction where the mattress is rolling out to prevent any unnecessary injury. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)
Share

Customer Reviews
-
⭐⭐⭐⭐⭐
"The mix of modern design and natural colors makes these chairs versatile for any room in my house."
– Michael B.
-
⭐⭐⭐⭐⭐
"Elegant, comfortable, and built to last. The brown leather dining chairs transformed our dinner space completely."
– Sophia L.
-
⭐⭐⭐⭐⭐
"Every detail is thoughtfully designed. The stitching, the wood finish, everything speaks of elegance."
– Ethan S.
Blog Posts
View all-
furniture replacement checklist
"I can still use it" and "I have to keep using it" are different Furniture is not easily thrown away.Because I'm used to it, I'm not broken, I'm just there.But...
furniture replacement checklist
"I can still use it" and "I have to keep using it" are different Furniture is not easily thrown away.Because I'm used to it, I'm not broken, I'm just there.But...
-
🌟 Spend 2025, heading toward 2026 🌟
Thank you for participating in the journey. 2025 was a really special year for us.At the center of the journey has always been you and your customers. One visit, one...
🌟 Spend 2025, heading toward 2026 🌟
Thank you for participating in the journey. 2025 was a really special year for us.At the center of the journey has always been you and your customers. One visit, one...
-
Ergonomic Chair Explodes Popular in the U.S
A Secret That Can Relax Your Back Even After Long Sitting, An Ergonomic Chair Explodes Popular in the U.S If you sit in front of your desk all day longBack...
Ergonomic Chair Explodes Popular in the U.S
A Secret That Can Relax Your Back Even After Long Sitting, An Ergonomic Chair Explodes Popular in the U.S If you sit in front of your desk all day longBack...